Conversion of a track inspection trolley in Portugal

GMF has executed the conversion of a track inspection trolley (draisine) owned by Infraestruturas de Portugal for personnel transport into one dedicated to catenary. The process has focused on a lifting platform, a crane with a maximum lifting capacity of 8 tonnes and implementation of a gauge limitation system, a working hydrostatic traction system and […]