{"id":18241,"date":"2021-04-07T12:13:31","date_gmt":"2021-04-07T10:13:31","guid":{"rendered":"https:\/\/gmf.comsa.com\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/"},"modified":"2021-05-27T15:42:45","modified_gmt":"2021-05-27T13:42:45","slug":"reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia","status":"publish","type":"post","link":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/","title":{"rendered":"Comprehensive reconstruction of a locomotive damaged during the rainstorm"},"content":{"rendered":"<p>In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from <a href=\"https:\/\/captrain.es\/\" target=\"_blank\" rel=\"noopener\" data-attribute-index=\"0\" data-entity-hovercard-id=\"urn:li:fs_miniCompany:5648663\" data-entity-type=\"MINI_COMPANY\">Captrain Espa\u00f1a<\/a> was swept away by the water and fell into a ravine. Fortunately, the serious accident did not have consequences in terms of personal injury, thanks to the courage and expertise of the professional who drove it.<\/p>\n<p>Three-quarters of the locomotive were submerged in water and mud. After a complex recovery operation, the locomotive was transferred to the GMF workshop in Constant\u00ed (Tarragona, Spain).<\/p>\n<p>Since then, in the workshop, the locomotive has undergone a comprehensive rebuild, in which all electronic equipment, boards, converters, traction motors and diesel engine and alternators have been dismantled and sheet metal work and fabrication of a new semi-cab have been carried out. Multidisciplinary teams with great experience have intervened in the work.<\/p>\n<p>18 months later, the locomotive is back on track. GMF thus proves its ability to do complex work on traction vehicles, both electric in alternating and direct current, as well as diesel (diesel electric, mechanical and hydraulic).<\/p>\n<p>&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-17291 aligncenter\" src=\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/\/reconstruccionlocomotora-300x243.jpg\" alt=\"\" width=\"300\" height=\"243\" srcset=\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora-300x243.jpg 300w, https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg 741w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the water and fell into a ravine. Fortunately, the serious accident did not have consequences in terms of personal injury, thanks to the courage and expertise of the professional who [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17291,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3364],"tags":[],"class_list":["post-18241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Comprehensive reconstruction of a locomotive damaged during the rainstorm - GMF<\/title>\n<meta name=\"description\" content=\"In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comprehensive reconstruction of a locomotive damaged during the rainstorm - GMF\" \/>\n<meta property=\"og:description\" content=\"In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\" \/>\n<meta property=\"og:site_name\" content=\"GMF\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-07T10:13:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-27T13:42:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"741\" \/>\n\t<meta property=\"og:image:height\" content=\"599\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vunkers\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vunkers\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\"},\"author\":{\"name\":\"vunkers\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c\"},\"headline\":\"Comprehensive reconstruction of a locomotive damaged during the rainstorm\",\"datePublished\":\"2021-04-07T10:13:31+00:00\",\"dateModified\":\"2021-05-27T13:42:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\"},\"wordCount\":183,\"publisher\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\",\"url\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\",\"name\":\"Comprehensive reconstruction of a locomotive damaged during the rainstorm - GMF\",\"isPartOf\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg\",\"datePublished\":\"2021-04-07T10:13:31+00:00\",\"dateModified\":\"2021-05-27T13:42:45+00:00\",\"description\":\"In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the\",\"breadcrumb\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage\",\"url\":\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg\",\"contentUrl\":\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg\",\"width\":741,\"height\":599},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\/\/gmf.comsa.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comprehensive reconstruction of a locomotive damaged during the rainstorm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/#website\",\"url\":\"https:\/\/gmf.comsa.com\/en\/\",\"name\":\"GMF\",\"description\":\"Especialistas en el mantenimiento integral de material rodante ferroviario\",\"publisher\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gmf.comsa.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/#organization\",\"name\":\"GMF | Gesti\u00f3n de Maquinaria Ferroviaria\",\"url\":\"https:\/\/gmf.comsa.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/logo-gmf-1.png\",\"contentUrl\":\"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/logo-gmf-1.png\",\"width\":435,\"height\":60,\"caption\":\"GMF | Gesti\u00f3n de Maquinaria Ferroviaria\"},\"image\":{\"@id\":\"https:\/\/gmf.comsa.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/gmf.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c\",\"name\":\"vunkers\",\"sameAs\":[\"https:\/\/comsa.vunkers.dev\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comprehensive reconstruction of a locomotive damaged during the rainstorm - GMF","description":"In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/","og_locale":"en_US","og_type":"article","og_title":"Comprehensive reconstruction of a locomotive damaged during the rainstorm - GMF","og_description":"In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the","og_url":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/","og_site_name":"GMF","article_published_time":"2021-04-07T10:13:31+00:00","article_modified_time":"2021-05-27T13:42:45+00:00","og_image":[{"width":741,"height":599,"url":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg","type":"image\/jpeg"}],"author":"vunkers","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vunkers","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#article","isPartOf":{"@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/"},"author":{"name":"vunkers","@id":"https:\/\/gmf.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c"},"headline":"Comprehensive reconstruction of a locomotive damaged during the rainstorm","datePublished":"2021-04-07T10:13:31+00:00","dateModified":"2021-05-27T13:42:45+00:00","mainEntityOfPage":{"@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/"},"wordCount":183,"publisher":{"@id":"https:\/\/gmf.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage"},"thumbnailUrl":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/","url":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/","name":"Comprehensive reconstruction of a locomotive damaged during the rainstorm - GMF","isPartOf":{"@id":"https:\/\/gmf.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage"},"image":{"@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage"},"thumbnailUrl":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg","datePublished":"2021-04-07T10:13:31+00:00","dateModified":"2021-05-27T13:42:45+00:00","description":"In the storm of October 2019, during its trip between Barcelona and Lleida (Spain), the dual locomotive 601-004 from Captrain Espa\u00f1a was swept away by the","breadcrumb":{"@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#primaryimage","url":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg","contentUrl":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/reconstruccionlocomotora.jpg","width":741,"height":599},{"@type":"BreadcrumbList","@id":"https:\/\/gmf.comsa.com\/en\/news\/reconstruccion-integral-locomotora-danada-durante-el-temporal-de-lluvia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/gmf.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Comprehensive reconstruction of a locomotive damaged during the rainstorm"}]},{"@type":"WebSite","@id":"https:\/\/gmf.comsa.com\/en\/#website","url":"https:\/\/gmf.comsa.com\/en\/","name":"GMF","description":"Especialistas en el mantenimiento integral de material rodante ferroviario","publisher":{"@id":"https:\/\/gmf.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gmf.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/gmf.comsa.com\/en\/#organization","name":"GMF | Gesti\u00f3n de Maquinaria Ferroviaria","url":"https:\/\/gmf.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gmf.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/logo-gmf-1.png","contentUrl":"https:\/\/gmf.comsa.com\/wp-content\/uploads\/sites\/3\/logo-gmf-1.png","width":435,"height":60,"caption":"GMF | Gesti\u00f3n de Maquinaria Ferroviaria"},"image":{"@id":"https:\/\/gmf.comsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/gmf.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c","name":"vunkers","sameAs":["https:\/\/comsa.vunkers.dev"]}]}},"_links":{"self":[{"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/posts\/18241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=18241"}],"version-history":[{"count":2,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/posts\/18241\/revisions"}],"predecessor-version":[{"id":18243,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/posts\/18241\/revisions\/18243"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/media\/17291"}],"wp:attachment":[{"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=18241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=18241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gmf.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=18241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}